Compressor maintenance, Chillers optichill, Maintenance – Airedale OptiChill FreeCool 500kW - 1365kW User Manual

Page 57

Advertising
background image

Chillers

OPTICHILL

Chillers

57

Installation & Maintenance : 6564868 02/2013

Maintenance

GENERAL MAINTENANCE

6 MONTHS

ACTION

NOTES

Repeat 3 month checks plus the following:

SYSTEM

Check evaporator heater and low ambient
thermostat are set to activate at 4.0ºC.

Remember to re-cap the Schrader
connections!

12 MONTHS

ACTION

NOTES

Repeat 6 month checks plus the following:

SYSTEM

Check safety devices cut out the compressor at the
correct settings.

REFRIGERATION Check glycol concentration if appropriate.

Adjust as necessary.

Leak test all refrigerant joins and inspect all
water connections.

Rectify as necessary.

ELECTRICAL

Tighten all electrical terminals.

COMPRESSOR
MAINTENANCE

Periodic maintenance and inspection of this equipment is necessary to prevent premature
failure, the following periodic inspections should be carried out by period or hourly use
which ever is sooner.

1 Year

Measure compressor motor insulation.

7,500 Hours or 4 Years

Inspect compressor oil.

20,000 Hours or 4 Years

Inspect oil filter, suction filter, check valve and pressure-
relief valve.

SHUT DOWN PERIODS

For periods of winter shut down the following precautions are recommended:

Close the liquid and discharge ball valve

Cap service ports

Turn off electrical circuits

Drain the water from the chiller evaporator via the evaporator drain plug