Compressor maintenance, Chillers optichill, Maintenance – Airedale OptiChill FreeCool 500kW - 1365kW User Manual
Page 57
Chillers
OPTICHILL
Chillers
57
Installation & Maintenance : 6564868 02/2013
Maintenance
GENERAL MAINTENANCE
6 MONTHS
ACTION
NOTES
Repeat 3 month checks plus the following:
SYSTEM
Check evaporator heater and low ambient
thermostat are set to activate at 4.0ºC.
Remember to re-cap the Schrader
connections!
12 MONTHS
ACTION
NOTES
Repeat 6 month checks plus the following:
SYSTEM
Check safety devices cut out the compressor at the
correct settings.
REFRIGERATION Check glycol concentration if appropriate.
Adjust as necessary.
Leak test all refrigerant joins and inspect all
water connections.
Rectify as necessary.
ELECTRICAL
Tighten all electrical terminals.
COMPRESSOR
MAINTENANCE
Periodic maintenance and inspection of this equipment is necessary to prevent premature
failure, the following periodic inspections should be carried out by period or hourly use
which ever is sooner.
1 Year
Measure compressor motor insulation.
7,500 Hours or 4 Years
Inspect compressor oil.
20,000 Hours or 4 Years
Inspect oil filter, suction filter, check valve and pressure-
relief valve.
SHUT DOWN PERIODS
For periods of winter shut down the following precautions are recommended:
Close the liquid and discharge ball valve
Cap service ports
Turn off electrical circuits
Drain the water from the chiller evaporator via the evaporator drain plug