UNPACKING AND INSPECTION

Follow these guidelines when unpacking the M-Series equipment .

If a shipping container shows any sign of damage, have the shipper present when you unpack the meter .

Follow all unpacking, lifting and moving instructions associated with the shipping container .

Open the container and remove all packing materials . Store the shipping container and packing

materials in the event the unit needs to be shipped for service .

Verify that the shipment matches the packing list and your order form .

Inspect the meter for any signs of shipping damage, scratches, or loose or broken parts .

OTEE:

N

If the unit was damaged in transit, it is your responsibility to request an inspection report from the carrier within 48

hours . You must then file a claim with the carrier and contact Badger Meter for appropriate repairs or replacement .

All detectors with polytetrafluoroethylene (PTFE) liners are shipped with a liner protector on each end to maintain

proper form of the PTFE material during shipping and storage .

OTEE:

N

Do not remove the liner protectors until you are ready to install .

Storage: If the meter is to be stored, place it in its original container in a dry, sheltered location . Storage temperature

ranges are: – 40…160° F (– 40…70° C) .

Rigging, Lifting and Moving Large Units

WHEN RIGGING, LIFTING OR MOVING LARGE UNITS, FOLLOW THESE GUIDELINES:

DO NOT lift or move a meter by its amplifier, junction box or cables .

Use a crane rigged with soft straps to lift and move meters with flow tubes that are between two inches and eight

inches (50 mm and 200 mm) . Place the straps around the detector body, between the flanges, on each side of the

detector .

Use the lifting lugs when lifting meter flow tubes that are 10 inches (250 mm) in diameter or larger .

®

®

Place straps between flanges .

Use lifting lugs with 10-inch or larger meters .