Installation and upgrade requirements, Removing a processor and heatsink, Installation and upgrade requirements -2 – HP ProLiant BL20p G3 Server Blade User Manual

Page 31: Removing a processor and heatsink -2

Advertising
background image

Hardware Options Installation

Installation and Upgrade Requirements

Observe the following requirements before installing a processor in the server blade:

Before installing a processor in the server, processor socket 1 must always be
populated. If the processor is missing from socket 1, the system will not power
on.

If processors of differing speeds are installed, each processor matches the speed
of the slowest processor.

Removing a Processor and Heatsink

For information on accessing internal server blade components, refer to “Accessing
Internal Server Blade Components” in Chapter 3, “Server Blade Setup.”

IMPORTANT: The heatsink is not reusable and must be discarded if removed from the
processor after application.

Figure 4-1: Unlatching the heatsink locking levers and
removing the heatsink

4-2

HP ProLiant BL20p Generation 3 Server Blade User Guide





Advertising