5 cnt ac-s z configuration, Configuration workflow, Defining port attributes – HP XP7 Storage User Manual

Page 59: Configuration workflow defining port attributes

Advertising
background image

5 Cnt Ac-S Z configuration

This chapter provides instructions for configuring Continuous Access Synchronous Z.

Configuration workflow

You must have Storage Administrator (Remote Copy) role to perform most Continuous Access
Synchronous Z operations using Remote Web Console.

Configuration consists of the following operations:

•

Check prerequisites for each procedure.

•

See

“Planning pairs and pair volumes” (page 34)

.

•

On the primary and secondary system, install the data paths. See

“Data path requirements

and configurations” (page 46)

.

•

On primary and secondary system, configure the initiator and RCU target ports Fibre Channel
ports that will be used for Continuous Access Synchronous Z operations. See

“Ports” (page 49)

and

“Defining port attributes” (page 59)

for details.

•

On the primary system, create the Continuous Access Synchronous Z association with the
secondary system. See

“Setting up primary and secondary systems for Cnt Ac-S Z” (page 60)

.

Remote paths between the systems are added during this procedure.

You may also perform these additional procedures prior to the initial copy:

•

Add additional remote paths. See

“Configuring additional remote paths” (page 86)

.

•

Specify the number of volumes to copy at one time. See

“Setting # of vols. copied, path

blockade, other options” (page 62)

.

Defining port attributes

Initiator and RCU target ports must be set up on the primary and secondary system for Continuous
Access Synchronous Z command and data transfer.

Prerequisite information

•

Storage Administrator (System Resource Management) is required.

•

The number of hosts connected to a target port must be limited to 128 or fewer to avoid
disconnection.

•

See

“Ports” (page 49)

for information about target, initiator, and RCU target ports.

•

If you are changing a target port to an initiator port, prepare the port for the change as follows:

Confirm that the port is offline.

◦

◦

Disconnect the port from the host.

◦

Remove all channel paths to the port.

•

If you are changing an initiator port to target or RCU target port, prepare the port for the
change as follows:

◦

Release all pairs using the ports.

◦

Delete the paths from the initiator port to the secondary storage system.

◦

Delete the secondary storage system from the Cnt Ac-S Z relationship. See

“Deleting

Continuous Access Synchronous Z” (page 90)

.

Configuration workflow

59

Advertising
This manual is related to the following products: