HP XP7 Storage User Manual

Page 49

Advertising
background image

Prerequisites for resynchronizing pairs

•

This operation is performed from the primary system only.

•

Pair status must be PSUS or PSUE.

If pair status is HOLD, HOLDING, or HLDE, use the resynchronizing mirrors operation (see

“Resynchronizing mirrors ” (page 50)

).

•

Pairs suspended by the system (PSUE status) can be resynchronized after the error causing
the suspension is corrected.

The following additional information may be useful before beginning the procedure:

•

Performing the operation on a pair in HLDE status changes the status to HOLD.

•

The primary system does not resynchronize a pair that is suspended due to an error until the
cause of error is resolved.

•

If P-VOL status is Failure and S-VOL status is unpaired, the pair cannot be recovered by
resynchronizing. It must be deleted and created again.

•

Resynchronizing pairs when I/O load is low reduces impact on performance. Operations on
multiple pairs in the same mirror with different statuses may results in suspension during periods
of heavy write I/O.

•

If you resynchronize pairs in PAIR status and other than PAIR status in the same mirror, an
unexpected suspension could occur during the operation under heavy I/O load conditions.
You can estimate whether the I/O load is heavy or not from frequency of host I/Os. This
operation should be performed under light I/O load conditions.

Procedure 5 To resynchronize a pair

1.

In the Storage Systems tree, click Replication > Remote Replication, and then select the Cnt
Ac-J Pairs tab.

2.

From the Actions menu, click Remote Replication > Resync Pairs.

3.

In the Resync Pairs window, review the pairs in the Selected Pairs table. You can remove a
pair from the table by selecting it and clicking Cancel.

Resynchronizing Cnt Ac-J pairs

49

Advertising
This manual is related to the following products: