Campbell Scientific T.Weather T107 Toro Weather Station User Manual

Page 22

Advertising
background image

T107 Weather Station

horizontally. Place a piece of scrap wood over the very end of the top

section of the pole and gently hammer on the scrap wood to fit the two

halves together. A 1.27 cm (1/2 in) gap between the top and bottom pole

sections is acceptable. Lay the assembled pole on the ground next to the

concrete foundation.

3. Cut and save a 9 inch piece of 12 AWG ground wire from the 12 foot

length provided. This will be used later to attach the enclosure ground to

the lightning rod assembly (reference FIGURE 2-6).

4. Thread communication cable, power cable with connector ends of cable

out the top of tower, and grounding wire through the tower and conduit.

Electrical fish tape will help. Leave approximately two feet of the

supplied power and communication cable hanging out of the top of the

pole. Secure all wiring so it doesn’t slip back down through the pole.

Solar panel and RF options will not have power or communication

cables.

5. Place the white tower cap over the tower end.
6. Raise the tower on a still day. Place a washer on top of the two nuts on

each foundation bolt. Taking great care not to damage cables between the

tower and conduit, raise the tower and lower it onto the conduit and

mounting bolts. Install a washer and nut on each bolt and hand tighten.

Check plumb of the tower by placing a level on the north and east sides of

the lower tower section. Adjust the topmost of the two lower nuts

(leveling nut) on each bolt as necessary. When plumb is established, lock

the leveling nut in place by tightening the lowest nut against it. Tighten

the three top nuts with the wrench.

FIGURE 2-4. Transparent View Shows Raising and Grounding the ET

Tower

NOTE

4 AWG Wire

Ground Rod

Concrete

Foundation

Anchor Bolt

ET Tower

Leveling

Nut

Swept Elbow Conduit

14

Advertising