Warning – Bryant Gas Furance 315AAV User Manual

Page 11

Advertising
background image

11

1

3

/

4

1

3

/

4

1

3/

4

1

3/

4

5/

16

5

/

16

5/

16

5/

16

(44mm)

(8mm)

(44mm)

(8mm)

(8mm)

(8mm)

(44mm)

(44mm)

A89014

Fig. 10 -- Leveling Legs

NOTE: Bottom closure must be used when leveling legs are
used. It may be necessary to remove and reinstall bottom closure
panel to install leveling legs. To remove bottom closure panel, see
Item 1 in Bottom Return Air Inlet section in Step 1 above.
To install leveling legs:

1. Position furnace on its back. Locate and drill a hole in

each bottom corner of furnace. (See Fig. 10.)

2. For each leg, install nut on bolt and then install bolt with

nut in hole. (Install flat washer if desired.)

3. Install another nut on other side of furnace base. (Install

flat washer if desired.)

4. Adjust outside nut to provide desired height, and tighten

inside nut to secure arrangement.

5. Reinstall bottom closure panel if removed.

DOWNFLOW INSTALLATION
NOTE
: For downflow applications, this furnace is approved for
use on combustible flooring when any one of the following 3
accessories are used:

S

Special Base, KGASB

S

Cased Coil Assembly Part No. CNPV, CNRV, CAP, or
CAR

S

Coil Box Part No. KCAKC

1. Determine application being installed from Table 4.
2. Construct hole in floor per Table 4 and Fig. 11.
3. Construct plenum to dimensions specified in Table 4 and

Fig. 11.

4. If downflow subbase, KGASB is used, install as shown in

Fig. 12. If Coil Assembly Part No. CPVP, CAPMP or

CNPVP Coil Box Part No. KCAKC is used, install as
shown in Fig. 13.

NOTE: It is recommended that the perforated supply--air duct
flanges be completely folded over or removed from furnace when
installing the furnace on a factory--supplied cased coil or coil box.
To remove the supply--air duct flange, use wide duct pliers or
hand seamers to bend flange back and forth until it breaks off. Be
careful of sharp edges. (See Fig. 14.)
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in

bottom return--air opening. Remove and discard this panel when
bottom return air is used. To remove bottom closure panel,

perform the following:

1. Tilt or raise furnace and remove 2 screws holding bottom

filler panel. (See Fig. 9.)

2. Rotate bottom filler panel downward to release holding

tabs.

3. Remove bottom closure panel.
4. Reinstall bottom filler panel and screws.

HORIZONTAL INSTALLATION

FIRE, EXPLOSION, AND CARBON MONOXIDE

POISONING HAZARD
Failure to follow this warning could result in personal

injury, death, or property damage.
Do not install the furnace on its back or hang furnace with

control compartment facing downward. Safety control

operation will be adversely affected. Never connect

return--air ducts to the back of the furnace.

!

WARNING

The furnace can be installed horizontally in an attic or crawlspace

on either the left--hand (LH) or right--hand (RH) side. The furnace
can be hung from floor joists, rafters or trusses or installed on a

non--combustible platform, blocks, bricks or pad.
Suspended Furnace Support
The furnace may be supported under each end with threaded rod,
angle iron or metal plumber’s strap as shown. (See Fig. 15 and

16.) Secure angle iron to bottom of furnace as shown.
Heavy--gauge sheet metal straps (plumber’s straps) may be used

to suspend the furnace from each bottom corner. To prevent

screws from pulling out, use 2 #8 x in. screws into the side and 2
#8 x in. screws in the bottom of the furnace casing for each strap.

(See Fig. 15 and 16.)
If the screws are attached to ONLY the furnace sides and not the

bottom, the straps must be vertical against the furnace sides and

not pull away from the furnace sides, so that the strap attachment
screws are not in tension (are loaded in shear) for reliable support.
Platform Furnace Support
Construct working platform at location where all required furnace

clearances are met. (See Fig. 2 and 17.) For furnaces with 1--in.
(25 mm) clearance requirement on side, set furnace on

non--combustible blocks, bricks or angle iron. For crawlspace
installations, if the furnace is not suspended from the floor joists,

the ground underneath furnace must be level and the furnace set

on blocks or bricks.

315AA

V

Advertising