Informations – IKA C 1 Package 1/10 User Manual

Page 33

Advertising
background image

33

Change seal:

1 In the Menu Maintenance press „change seal“ button. This

requires oxygen pressure be present at C1.

2 Unscrew the piston (Pos. 38 III) with screwdriver

counterclockwise

3 Remove the O-ring (Pos. 38 VI)

4 Put new O-ring on piston (Pos. 38 VI)

5 Screw in piston and tighten securely

6 „Change seal“ button again actuate pistons move to the

home position

38

38

III

Stirrer test

The stirrer is switched on and off for a visual check.

O

2

System blow:

1 Lift out the inner vessel from the bottom and set aside

2 After about 20 seconds the button „O2 system blow“ button.

Keep openings with a paper towel or similar covered by hand

3 After about 3 seconds, this state switches itself off again.

This any remaining condensed water and dirt is

in the line blown out.

This screen shows:

•

the software and firmware version

•

the serial number of the device

•

the date of the last service

•

the date of the last pressure test

•

the number of performed ignitions

•

the number of ignitions in the next pressure test must be

performed

•

the number of performed ignitions and support information

•

IKA - Contact information

blow

O-ring

(Water inlet valve

seal)

Informations

Stirrer

Servo up

The locking pin is extended.

Servo down

The locking pin is retracted.

VI (

8,0x2,5)

C1 092014

locking pin

Advertising
This manual is related to the following products: