General

Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue checking each item in sequence for the con-
ditions listed in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no visi-
ble damage, leaks or excessive wear exists in addition to any other
criteria mentioned.

1.

Platform Assembly and Gate - Footswitch works prop-
erly, not modified, disabled or blocked. Gate latch and
hinges in working condition.

2.

Platform & Ground Control Consoles - Switches and
levers return to neutral, decals/placards secure and legible,
control markings legible.

3.

Boom Sections/Turntable - See Inspection Note.

4.

Swing Drive - No evidence of damage.

5.

Wheel/Tire Assemblies - Properly secured, no missing lug
nuts. Inspect for worn tread, cuts, tears or other discrepan-
cies. Inspect wheels for damage and corrosion.

6.

Drive Motor, Brake, and Hub - No evidence of leakage.

7.

Hood Assemblies - See Inspection Note.

8.

Auxiliary Hydraulic Pump - See Inspection Note.

9.

All Hydraulic Cylinders - No visible damage; pivot pins
and hydraulic hoses undamaged, not leaking.

10.

Turntable Bearing - Evidence of proper lubrication. No
evidence of loose bolts or looseness between bearing and
machine.

11.

Steering Spindles and Sensors - See Inspection Note.