JLG 1500SJ Operator Manual User Manual
Page 50
Advertising
SECTION 3 - MACHINE CONTROLS AND INDICATORS
3-6
– JLG Lift –
3121261
10.
Lift Control
Provides raising and lowering
of the main boom.
11.
Swing Control
Provides 360 degrees contin-
uous turntable rotation.
12.
Main Telescope Control
Provides extension and
retraction of the main boom.
13.
Boom Control System Test
Button
The push button is used to test the
boom control system and confirm
that it is working properly.
Advertising