Shutdown procedure, Shutdown procedure -8 – JLG 1500SJ Operator Manual User Manual

Page 74

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-8

– JLG Lift –

3121261

6.

From the Platform, pull the Power/Emergency
Stop switch out.

7.

Push the Engine Start switch until engine
starts.

NOTE:

Footswitch must be in released (up) position before starter will
operate. If starter operates with footswitch in the depressed posi-
tion, DO NOT OPERATE MACHINE.

Shutdown Procedure

IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUTDOWN, DETERMINE
THE CAUSE AND CORRECT IT BEFORE RESTARTING THE ENGINE.

1.

Remove all load and allow engine to operate at low speed
for 3-5 minutes; this allows further reduction of internal
engine temperature.

2.

Push Power/Emergency Stop switch in.

3.

Turn key of Platform/Ground Select switch to
the Off position.

Refer to Engine Manufacturer’s manual for detailed
information.

Advertising