10 quick-change platform mounting, Platform removal (see illustration following), Platform installation – JLG 15/20MSP Operator Manual User Manual

Page 57: 10 quick-change platform mounting -31, Platform removal (see illustration following) -31, Platform installation -31

Advertising
background image

SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION

3121230

– JLG Lift –

3-31

3.10 QUICK-CHANGE PLATFORM MOUNTING

MVL Model Lifts are equipped with quick-change platform mounts
which allow quick removal and installation of currently available
quick-change platforms.

NOTE: MSP Models require the installation of the Quick-Change

mount kit to use Quick-Change Platforms.

Platform Removal

(see illustration following)

1. Remove the platform control console from the platform and

lay aside.

2. Remove both upper and lower mount attach pins securing

the platform support rails to the mast mounting channels.

3. Swing and lift the platform out of the mounts and lay aside.

Platform Installation

1. Set platform in upper and lower mounts.

2. Install attach pins in upper and lower mounts.

3. Attach platform control console to platform rail.

ENSURE ALL PINS AND FASTENERS ARE INSTALLED AND SECURE
PRIOR TO OPERATION.

Quick-Change Platform Mounting

1. Upper Platform Mount

3. Lower Platform Mount

2. Upper Mount Attach Pins

4. Lower Mount Pins

1

3

2

4

Advertising
This manual is related to the following products: