JLG X20J Plus Operator Manual User Manual
Page 119
7.7 PERIODICAL MAINTENANCE INTERVALS
HONDA PETROL ENGINE
* First operation.
** At least every 3 months.
*** At least every 5 years.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the same
specifications and restore the connection without using oil or grease.
115
BOOM LIFT MODELS X20JPLUS
JLG
X20JPR0020413
PART
INTERVENTION
BEFORE
STARTING
AS NEEDED
INTERVAL (HOURS)
10
50
100
250
500
1000
2000
DRY AIR FILTER
CHECK, CLEAN
•
CHANGE
•
ENGINE OIL
CHECK LEVEL
•
•
CHANGE
•
*
•
OIL SUMP
CLEAN
•
FUEL TANK AND NET
CLEAN
•
HYDRAULIC OIL
CHECK LEVEL
•
CHANGE
•
HYDRAULIC OIL
FILTER
CHANGE CARTRIDGE
•
*
•
ARTICULATED JOINT
POINTS
GREASE
•
*
•
BATTERY
CHECK ELECTROLYTE
LEVEL
•
REDUCTION GEAR
OIL
CHECK LEVEL
•
CHANGE
•
*
•
MACHINE
GENERAL PERIODICAL
CHECKS
•
•
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
•
CHANGE
•
TURNTABLE BOLT
TIGHTENING
CHECK
•
*
•
NUT FIXING PINS
BASKET
CHECK TORQUE
200 Nm
•
#
EXTENSION ROPES
AND PULLEYS
CHECK WEAR
•
**
•
*
REPLACEMENT
•
***