End brackets installation – Landoll PT Series 10 through 20 Transport Pulverizer User Manual

Page 13

Advertising
background image

ASSEMBLY

2-3

End Brackets Installation:

1.

Start with the right hand end plate and the two angle
members required, See Figure 2-3.

2.

Bolt the three pieces together using a 1/2"-13 x
1-3/4" Screw, and a 1/2" Lockwasher and Nut in the
common hole and 1/2"-13 X 1-1/2" Screws, 1/2"
Lockwashers and Nuts for the remaining holes.

3.

Attach Light Mount Brackets, using 5/8-11 x 6-11/16
x 5 1/2 U-bolts and 1/2-13 Flange Nuts. (On 18’ - 20’
machines 3K320 Strap, 1J696 Bolt, Washer 9C134
and 2P253 Flange Nut are used in place of U-bolts.)

4.

Assemble the left hand end bracket in the same
manner.

Figure 2-3: End Brackets Installation

(This end bracket configuration
is supplied on some models.)

SCREW, 1/2” x 1 3/4”

SCREW, 1/2” x 1 1/2”

NUT, 5/8”

LOCKWASHER, 5/8”

SCREW, 1/2” x 1 3/4”
LOCKWASHER, 3/4”
NUT, 3/4”

BEARING ASSEMBLY

END
BRACKET

LOCKWASHER, 1/2”

U-BOLT, 5/8”

SCREW, 1/2” x 1 1/2”

NUT, 1/2”

U-BOLT, 1/2”

18’-20’
MODELS

LIGHT MOUNT
BRACKETS

Advertising
This manual is related to the following products: