Landoll PT Series 10 through 20 Transport Pulverizer User Manual

Page 32

Advertising
background image

2-22

9J017

ASSEMBLY

Scraper Assembly Procedure for the
Optional 8J001 Wheel

1.

Attach scraper brackets to frame tube of pulverizer.
See Figure 2-22.

IMPORTANT

Prior to installing the scrapers ensure the pulverizer
is placed on the ground. Otherwise scraper to wheel
clearance will be affected.

NOTE

On machines with 4” x 6” frame tube, there are three
brackets used and U-bolts are used for attaching as
shown above. Put middle bracket as close to machine
center as possible and outer brackets close to outside
ends of frame. On machines with a 6” x 6” frame tube,
there are four brackets used. Straps and 7 1/2” long
machine bolts are used for attaching instead of U-bolts.

2.

Assemble one bracket at each end of frame and
assemble the remaining two brackets such that the
space between all brackets is approximately equal.

3.

Attach the 2” square scraper tube to the scraper
brackets. Use 1/2” U-bolts, Flat Washers,
Lockwashers and Nuts. Be sure the scraper tube is
centered on machine.

4.

Mount scrapers to scraper tube using 3/8” U-bolts,
Flat Washers, Lockwashers and Nuts. The one wide
scraper is used at the center. (Allow a small amount
of clearance, approximately 1/8” between scrapers
and wheel surface.)

Figure 2-22: 8J001 Wheel Assembly

3/8” U-BOLTS, FLAT WASHERS,
LOCKWASHERS, & NUTS

1/2” U-BOLTS, FLAT WASHERS,
LOCKWASHERS, & HEX NUTS

2” SQUARE TUBE

SCRAPER

SCRAPER BRACKET

FRAME
TUBE

1/2” U-BOLT,
LOCKWASHERS, &
HEX NUTS

8J001 WHEEL

Advertising
This manual is related to the following products: