Landoll PT Series 10 through 20 Transport Pulverizer User Manual

Page 15

Advertising
background image

ASSEMBLY

2-5

Figure 2-5: Wheel and Axle Installation - 2 of 4

6.

If the wheel gang has female hardware, slide the
wheel gang end-wise, toward the center bracket,
mating the square bore bearing with the stub shaft on
the center bracket.

7.

Install right hand end plate assembly on the center
frame tube: use 5/8-11 x 5 1/2” deep x 6 11/16”
center U-bolt, 5/8” Washers and Nuts on angle
8J099, and 1/2-13 x 7 1/2” deep x 4 1/2” center
U-bolts with 1/2” Lockwashers and Nuts on angle
8J100. See Figure 2-6. While installing, be sure to
mate the bearing with the end plate stub shaft.

Figure 2-6: Wheel and Axle Installation - 3 of 4

U-BOLT, 5/8”

MACHINE
BOLTS, 5/8”

STRAP

WHEEL GANG WITH
FEMALE HARDWARE

SCREW, 1/2” x 1 3/4”

SCREW, 1/2” x 1 1/2”

NUT, 5/8”

LOCKWASHER, 5/8”

END
BRACKET

LOCKWASHER, 1/2”

U-BOLT, 5/8”

SCREW, 1/2” x 1 1/2”

NUT, 1/2”

3K321
STRAP

MACHINE

BOLT, 1/2 x 7 1/2”

MACHINE
BOLT, 5/8 x 8”

U-BOLT, 1/2”

3K320
STRAP

Advertising
This manual is related to the following products: