Commissioning steps, 7commissioning – Lenze E82ZAFPC201 User Manual

Page 68

Advertising
background image

7

Commissioning

Commissioning steps

EDK82ZAFPC-201 DE/EN/FR 6.0

68

H2_Inbetriebnahmeschritte-Teil2MA

Commissioning steps

Note!

Follow the commissioning steps in the given order!

Step-by-step commissioning of the function module with DRIVECOM device control is
described below.

Step

Description

Detailed
information

1.

Configure the host system (master) for communication via the
function module.



72

2.

Inhibit the standard device via terminal 28 (CINH).

Set terminal 28 to LOW level.
Later on the standard device can be inhibited and enabled via the
bus system.

Documentation
for the standard
device

3.

Connect the mains voltage and, if available, the separate voltage
supply for the function module.

After approx. 1 second the standard device will be ready for
operation.
Controller inhibit (CINH) is active.



77

Reaction

The green LED ”Connection status to standard device” at the front
of the function module is lit (only visible with 8200 vector).
Keypad:  (if attached)



78

4.

Provide software compatibility with the function module.

DIP switch S8 = OFF



73

5.

Activate the bus terminating resistor of the first and last bus device
through DIP switch = ON.

Lenze setting: OFF



74

6.

A

Set the bus device address via ...
– C1509 or
– DIP switches S1 ... S7.

If the setting via code applies (DIP switches S1 ... S7 = OFF), then the
address must be reassigned after a parameter set transfer.



75

B

Switch off the voltage supply of the function module and the
standard device, and then switch it on again to accept the
changed settings.

Address modifications via keypad become effective immediately.

Advertising