Commissioning – Lenze E82ZAFPC201 User Manual

Page 69

Advertising
background image

Commissioning

Commissioning steps

7

EDK82ZAFPC-201 DE/EN/FR 6.0

69

H2_Inbetriebnahmeschritte-Teil2MA

Detailed
information

Description

Step

7.

It is now possible to communicate with the standard device, i.e. all
codes can be read and all writable codes can be adapted to the
application.

Documentation
for the standard
device

Reaction
The yellow LED on the function module is blinking when the
PROFIBUS is active.



78

8.

Select the function module as the source for control commands and
setpoints.

Set C0005 = 200.
– A preconfiguration for operation with the function module is

carried out.

– Control words and status words are already linked.

Advertising