Commissioning – Lenze E82ZAFPC201 User Manual
Page 71
Advertising
![background image](/manuals/565871/71/background.png)
Commissioning
Commissioning steps
7
EDK82ZAFPC-201 DE/EN/FR 6.0
71
H2_Inbetriebnahmeschritte-Teil2MA
Detailed
information
Description
Step
12.
Enable the standard device via terminal 28 (CINH).
Set terminal 28 to HIGH level.
13.
Select the setpoint.
The master transmits the setpoint via the selected process data
output word.
14.
Change to the READY TO SWITCH ON state:
The master transmits the DRIVECOM control word:
0000 0000 0111 1110
bin
(007E
hex
).
15.
The standard device in the READY TO SWITCH ON state.
The master receives the DRIVECOM status word:
xxxx xxxx x01x 0001
bin.
16.
Change to the OPERATION ENABLED state.
The master transmits the DRIVECOM control word:
0000 0000 0111 1111
bin
(007F
hex
).
17.
The drive starts up.
Advertising