Installation check
5
l
111
EDKCSDE040 DE/EN/FR 4.0
5
Installation check
After completing the installation, check ...
ƒ
The wiring for completeness, short circuit and earth fault.
ƒ
The power connection:
–
Mains connection via terminals L1, L2, L3 (X21)
–
Connection of RFI filter / mains choke
–
Connection of brake resistor (internal/external) via terminals BR0, BR1
(X22)
–
Polarity of the DC−bus voltage supply via terminals +U
G
, −U
G
(X22)
ƒ
Control connection (X6):
–
Supply of 24 V supply, GND
–
Thermal detector contact of external brake resistor or bridge if internal
brake resistor is used at terminals T1, T2.
–
Wiring adjusted to the signal assignment of the control terminals.
ƒ
Communication via system bus (CAN).
)
Note!
The next step is the commissioning. Relevant information can be
found in the detailed documentation of the power supply module.
ƒ
Read the detailed documentation before switching on the power
supply module!
ƒ
Perform the commissioning according to the instructions in the
detailed documentation!