Installation check

5

l

111

EDKCSDE040 DE/EN/FR 4.0

5

Installation check

After completing the installation, check ...

ƒ

The wiring for completeness, short circuit and earth fault.

ƒ

The power connection:

Mains connection via terminals L1, L2, L3 (X21)

Connection of RFI filter / mains choke

Connection of brake resistor (internal/external) via terminals BR0, BR1
(X22)

Polarity of the DC−bus voltage supply via terminals +U

G

, −U

G

(X22)

ƒ

Control connection (X6):

Supply of 24 V supply, GND

Thermal detector contact of external brake resistor or bridge if internal
brake resistor is used at terminals T1, T2.

Wiring adjusted to the signal assignment of the control terminals.

ƒ

Communication via system bus (CAN).

)

Note!

The next step is the commissioning. Relevant information can be
found in the detailed documentation of the power supply module.

ƒ

Read the detailed documentation before switching on the power
supply module!

ƒ

Perform the commissioning according to the instructions in the
detailed documentation!