Magna-loc, Installation procedure overview – Metal Sales Magna-Loc Installation User Manual

Page 42

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 6/12

42

MAGNA-LOC

INSTALLATION PROCEDURE OVERVIEW

The following procedures (pages 22-47) are presented as a general guide for installing Magna-Loc panels, flashings, and

accessories on a typical building or residence. Details are shown for installing Magna-Loc and related flashings over solid

decking and over open framing. For other applications please contact your nearest Metal Sales location (See pages 2 and 3).

The installation procedures will involve:

Installation of Floating Rake Zee. (page 22)

Installation of Eave plate.

Installing panel from left to right (Looking from Eave to Peak.)

Panel Clip installation.

Endlapping of panel.

Sidelapping of panel.

Termination of panel.

Seaming panels.

Eave condition installation.

Gutter condition installation.

Valley condition installation.

Endlap condition installation.

Rake condition installation.

Rakewall condition installation.

Expansion Joint condition installation.

Endwall condition installation.

High Side Eave condition installation.

Ridge / Hip condition installation.

Ridge

(See Pages 66-68)

Magna-Loc Panel

(See Pages 8-10)

End Dam

(See Page 78)

Floating Rake Zee

(See Page 43)

SSR Rake Cleat

(See Pages 59 & 61)

Rake (Off Module)

(See Pages 60)

Gutter Support

(See Page 55)

Gutter

(See Page 55)

Eave Plate

(See Page 44)

Advertising