Chapter 3: installation and start up, Overview – RKI Instruments 12 VDC Beacon 200 User Manual

Page 15

Advertising
background image

12 VDC Beacon 200 Operator’s Manual • 11

Chapter 3: Installation and Start Up

Overview

This chapter describes procedures to mount the 12 VDC Beacon 200,
make wiring connections to the monitor, and start up the monitor.

WARNING: Perform all installation and start-up procedures in a

“fresh air” environment (known to be free of combustible
gas, toxic gas, and of normal oxygen content). The 12
VDC Beacon 200 is not in operation as a gas monitoring
system until the start-up procedure is complete.

Mounting the 12 VDC Beacon 200

Perform the following procedure to install the 12 VDC Beacon 200 at the
mounting site.

Advertising