12 VDC Beacon 200 Operator’s Manual • 11
Chapter 3: Installation and Start Up
Overview
This chapter describes procedures to mount the 12 VDC Beacon 200,
make wiring connections to the monitor, and start up the monitor.
WARNING: Perform all installation and start-up procedures in a
“fresh air” environment (known to be free of combustible
gas, toxic gas, and of normal oxygen content). The 12
VDC Beacon 200 is not in operation as a gas monitoring
system until the start-up procedure is complete.
Mounting the 12 VDC Beacon 200
Perform the following procedure to install the 12 VDC Beacon 200 at the
mounting site.