Chapter 3: installation and start up, Overview, Mounting the beacon 200 rig monitor – RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual
Page 18
Advertising

13 • Beacon 200 Rig Monitor Operator’s Manual
Chapter 3: Installation and Start Up
Overview
This chapter describes procedures to mount the Beacon 200 Rig Monitor,
make wiring connections to the monitor, and start up the monitor.
WARNING: Perform all installation and start-up procedures in a
“fresh air” environment (known to be free of combustible
gas, toxic gas, and of normal oxygen content). The
Beacon 200 Rig Monitor is not in operation as a gas
monitoring system until the start-up procedure is
complete.
Mounting the Beacon 200 Rig
Monitor
Perform the following procedure to install the Beacon 200 Rig Monitor at
the mounting site.