RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual

Page 19

Advertising
background image

Beacon 200 Rig Monitor Operator’s Manual • 14

1. Select the mounting site. When you select the mounting site consider

the following factors:

Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?

Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?

Mounting
Feet, 4X

8.0 Max

Ø .31 x .50 slot, 4X

RESET

Buzzer

3/4 Cable
Bushings (3X)

3/4 Conduit
Hubs (4X)

.41

FAIL

PILOT

Reset

Switch

7.00

6.45

AL AR M 2

AL AR M 1

4.83

8.50

6.00

10.50

10.94

BEACON 200

GAS MONI TOR

Figure 6. Rig Monitor Outline and Mounting Dimensions

Advertising