RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual
Page 19
Advertising
Beacon 200 Rig Monitor Operator’s Manual • 14
1. Select the mounting site. When you select the mounting site consider
the following factors:
•
Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?
•
Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?
Mounting
Feet, 4X
8.0 Max
Ø .31 x .50 slot, 4X
RESET
Buzzer
3/4 Cable
Bushings (3X)
3/4 Conduit
Hubs (4X)
.41
FAIL
PILOT
Reset
Switch
7.00
6.45
AL AR M 2
AL AR M 1
4.83
8.50
6.00
10.50
10.94
BEACON 200
GAS MONI TOR
Figure 6. Rig Monitor Outline and Mounting Dimensions
Advertising