Preventive maintenance – RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual

Page 46

Advertising
background image

41 • Beacon 200 Rig Monitor Operator’s Manual

VDC battery.

3. Remove the H

2

S detector junction box cover.

4. Disconnect the detector leads from the terminal block in the junction

box. Note the position of the color-coded leads as you remove them.

5. Unscrew the calibration cup/splash guard from the detector housing

cap.

6. Unscrew the detector from the junction box hub.

7. Guide the detector leads of the replacement detector through the

junction box hub then screw the mounting threads of the detector into
the hub.

8. Connect the detector leads to the terminal block the same way the old

detector was wired. See Figure 8 to verify the connections are correct.

9. Screw the calibration cup/splash guard onto the new detector’s

housing cap.

10. Reinstall the junction box cover.

11. Connect the battery clamps to the + and - terminals of the 12 VDC

battery.

12. Place the Rig Monitor’s power switch in the ON position, then verify

that the PILOT light is on.

CAUTION: Allow the replacement detector to warm up for 5 minutes

before you continue with the next step.

13. Calibrate the replacement detector as described in the Calibration

section of this manual.

Preventive Maintenance

This section describes a preventive maintenance schedule to ensure the
optimum performance of the H

2

S detectors. It includes daily, monthly, and

quarterly procedures.

Daily

Verify a display reading of 0 PPM H

2

S at the controller. Investigate

significant changes in the display reading.

Advertising