Figure 7. h, S detector outline and mounting dimensions – RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual
Page 20

15 • Beacon 200 Rig Monitor Operator’s Manual
•
Are the display screen and status lights visible?
2. Close and latch the housing door.
3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet
from the floor).
4. The Rig Monitor is shipped with the mounting feet positioned behind
the housing. Loosen the screws that secure the feet to the housing,
rotate the feet to their mounting position (as shown in Figure 6), then
tighten the screws.
5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at
each corner of the housing to secure the housing to the mounting
surface (see Figure 6).
6. Hang each H
2
S detector junction box using the mounting bracket.
Ensure that the detectors are facing down.
To Right
Cable
Bushing
To Left
Cable
Bushing
12 VDC
Battery
Cable
1.50
.75
Ø .75
Detector
Cable
Channel 2
Detector
Cable
Channel 1
To Middle
Cable
Bushing
14.2 Max
Figure 7. H
2
S Detector Outline and Mounting Dimensions