Figure 7. h, S detector outline and mounting dimensions – RKI Instruments Beacon 200 RIg Monitor, H2S/H2S User Manual

Page 20

Advertising
background image

15 • Beacon 200 Rig Monitor Operator’s Manual

Are the display screen and status lights visible?

2. Close and latch the housing door.

3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet

from the floor).

4. The Rig Monitor is shipped with the mounting feet positioned behind

the housing. Loosen the screws that secure the feet to the housing,
rotate the feet to their mounting position (as shown in Figure 6), then
tighten the screws.

5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at

each corner of the housing to secure the housing to the mounting
surface (see Figure 6).

6. Hang each H

2

S detector junction box using the mounting bracket.

Ensure that the detectors are facing down.

To Right

Cable

Bushing

To Left

Cable

Bushing

12 VDC

Battery

Cable

1.50

.75

Ø .75

Detector
Cable
Channel 2

Detector
Cable
Channel 1

To Middle

Cable

Bushing

14.2 Max

Figure 7. H

2

S Detector Outline and Mounting Dimensions

Advertising