Chapter 3: installation & startup, Overview, Mounting the m2 transmitter – RKI Instruments M2 Series User Manual

Page 19

Advertising
background image

M2 Transmitter Operator’s Manual

14

Chapter 3: Installation & Startup

Overview

This chapter describes procedures to mount the M2 Transmitter in the monitoring
environment and wire it to input power and devices.

Mounting the M2 Transmitter

1.

Select a mounting site that is representative of the monitoring environment. Consider
the following when you select the mounting site.

Select a site where the M2 is not likely to be bumped or disturbed. Make sure
there is sufficient room to perform start-up, maintenance, and calibration
procedures.

Select a site where the target gas is likely to be found first. For lighter gases,
mount the detector near the ceiling; for heavier gases, mount the detector near the
floor.

2.

At the monitoring site, use #10 screws through the junction box’s two mounting holes
to secure the junction box to a vertical surface. Figure 11 - Figure 16 show the outline
and mounting dimensions for each version of the M2. Mount the M2 with the detector
facing down as shown in the following figures.

Figure 11: Outline & Mounting Dimensions, Catalytic LEL

3/4 NPT
Conduit Hub

1 1/2-20 For
Calibration Cup

7.7 max

2.3 max

5.23

5.00

2.41

.30 (2X)

.47 (2X)

4.59

5.86

1.02

Advertising