RKI Instruments GD-K71D User Manual

Page 31

Advertising
background image

PT2E-1052

30

5−6.How to finish operation

When finish this operation, turn off power switch of this unit and turn off the main
power(DC24V).




















WARNING


・When finish this operation, do it after making point skip with the upper system

(Centralized system).

・ When finish this operation, check the external output and function of outer

equipment to be connected with external alarm contact. Then, judge whether
power can be shut off or not.

・When alarm contact is set on energized condition(optional), alarm contact works

when power supply(DC24V) to this unit is OFF.

In case of energized alarm contact, only power switch of this unit shall be put

OFF.

・In case of detecting high adsorptive gases, turn off the power after making cleaning

enough by fresh air.

Advertising