Assigning the control module to the cee, Building the pid loop – Rockwell Automation 1757-SWKIT5000 Getting Started with ProcessLogix R500.1 Quick Start User Manual

Page 18

Advertising
background image

18 Getting Started with ProcessLogix R500.1

Publication 1757-QS500A-EN-P - October 2002

Assigning the Control Module to the CEE

To assign the Control Module for the PID loop to the CEE:

1. From Control Builder, select Tools⇒Execution Environment Assignment.

2. On the Controller Assignments window, click the CMs/SCMs tab in the in the

Available Modules box.

3. Select FIC102 from the Available Modules box.

4. Select the CEE0101 from the CEE/Link box and click Assign.

The FIC102 module is displayed in the Assigned Modules box.

5. Close the Execution Environment Assignment window.

Building the PID Loop

To develop the PID loop:

1. In the Project tab, open the Control Module by double-clicking FIC102.

2. Click the Library tab.

3. Display the available function blocks by clicking the + to the left of the appropriate

library in the tree display.

4. Click the desired block, then drag and drop it onto the your diagram.

5. Rename the block by double-clicking the block to bring up the Parameters window.

6. Add the following function blocks to the Control Module:

In this library:

Choose this function block:

Rename:

DATAACQ

DATAACQ

DACA

IOCHANNEL

AICHANNEL

AI00

IOCHANNEL

AOCHANNEL

AO00

REGCTL

PID

PIDA

UTILITY

NUMERIC

NUMERIC

Advertising