Install the i/o modules, Power up the system – Rockwell Automation 1785-Lx0C15 ControlNet PLC-5 Programmable Controllers Quick Start User Manual

Page 20

Advertising
background image

Publication 1785-QS006C-EN-P - April 2002

2-6

Set Up the Hardware

Install the I/O Modules

For more information, see the installation instructions or user manual
for the specific module you are installing.

Power Up the System

Power up the system. Check the LED display on the processor. If
your system is operating properly, the PROC LED should be steady
red. If the PROC LED is not red, check operation of power or power
supply.

Connect the Personal
Computer to the
PLC-5 Processor

To connect the personal computer to the PLC-5 processor, refer to the
following publications:

ControlNet PLC-5 Programmable Controllers User Manual,

publication number 1785-UM022

Enhanced and Ethernet PLC-5 Programmable Controllers User

Manual, publication number 1785-6.5.12

the documentation provided with your communication card

Data Highway/Data Highway Plus/Data Highway II/Data

Highway 485 Cable Installation Manual, publication 1770-6.2.2

If you insert or remove the module while backplane
power is on, an electrical arc can occur. This could
cause an explosion in hazardous location
installations. Be sure that power is removed or the
area is nonhazardous before proceeding.

Locking

Bar

Card Guides

20618-M

Install each I/O module and connect

the wiring arm. Refer to the user

documentation you recieved with

the I/O module for more detailed

installation requirements.

WARNING

!

Advertising