Chapter

4

Using I/O in Your ControlNet Hot Backup
System

Chapter Objectives

This chapter describes special considerations when using I/O in a hot
backup system.

Considerations when Using
I/O

For scheduled connections, a special connection type has be
established called a redundant connection. A redundant connection
allows both processors to make identical scheduled connections and
only the outputs from the primary processor are used. The outputs
from the secondary processor are discarded.

ControlNet I/O (CIO) instructions must be managed differently in the
PLC-5 ControlNet Hot Backup system:

• with ControlNet I/O write instructions, the output should only

be sent from the primary processor. Use a simple ladder
program example described in this chapter to manage this.

• with ControlNet I/O read instructions, both PLC-5s can perform

the read instruction, or the primary PLC-5 can perform the read
instruction and the data can be crossloaded from the primary
PLC-5 to the secondary PLC-5.

HMI devices have specific requirements including:

• outputs sent from the backup system to the HMI device must

come from the primary PLC-5. There are specific procedures that
that we describe later in this chapter that instruct the HMI device
to determine the primary PLC-5. When the HMI device "knows"
which is the primary PLC-5, it can then gather the outputs
from it.

• HMI inputs must be sent to both the primary and secondary

PLC-5 programmable controllers in the Hot Backup system. This
chapter describes how to do this.

Finally, some of the I/O in the PLC-5 does not switch over when the
PLC-5 programmable controllers perform a switchover. The resident
chassis I/O and the I/O on the remote "blue wire" channel are not
backed up. Also, ControlNet scheduled connections not configured to
be the redundant connection type are not backed up. When a
switchover occurs, the new secondary PLC-5 continues to control the
outputs of the non-redundant outputs