App b - backup states, Chapter objectives, Backup states – Rockwell Automation 1785-CHBM ControlNet PLC-5 Hot Backup System User Manual User Manual

Page 81: Appendix b, Appendix

Advertising
background image

1

Publication 1785-UM024B-EN-P - January 2003

Appendix

B

Backup States

Chapter Objectives

This Appendix describes the possible backup states and backup state
transitions of the PLC-5 ControlNet backup system. There are four
main backup states:

• Invalid
• No Control
• Primary (and Lonely Primary)
• Secondary

POWERUP

NON_BACKUP

NO

CONTROL

STATE

PRIMARY

STATE

SECONDARY

STATE

NO BACKUP

CARD

STANDALONE
IN RUN MODE

PRIMARY FOUND,

QUALIFICATION PASSED,

IN RUN MODE

NOT IN

RUN MODE

NOT IN

RUN MODE

SWITCHOVER

BACKUP STATE DIAGRAM

INVALID

STATE

INVALID

BACKUP

CONFIGURATION

VALID

BACKUP

CONFIGURATION

Advertising