Final Checklist Before Energizing
This chapter provides guidance for the start-up of a newly installed DataSite 
configured panel.
It is recommended to make an itemized list including the following 
information:
•
Serial number
•
Number of units and their locations
•
System voltage
•
Other important data.
This itemized list should be saved in a file along with other data for the 
installation of the DataSite controller, such as component manuals, radio 
manuals, and wiring diagrams.
Perform a Pre-energizing 
Check Procedure
The following procedures should be performed by a “qualified person” as 
defined by Standards Publication NFPA 70E, 2004, “Standard for Electrical 
Safety in the Workplace” Article 110 “Qualified Person”:
“A qualified person shall be trained and knowledgeable of the 
construction and operations of equipment or a specific work method 
and be trained to recognize and avoid the electrical hazards that might 
be presented with respect to that equipment or work method.
a. Such person shall also be familiar with the proper use of the special
precautionary techniques…
b. An employee who is undergoing on-the-job training and who, in the
course of such training, has demonstrated the ability to perform 
duties safely at his or her level of training…
c. Such persons permitted to work within the Limited Approach
Boundary of exposed live parts operating at 50 volts or more…”