Chapter 4, Energizing and commissioning, Energizing equipment – Rockwell Automation 1748 DataSite Configured Panel Installation Instructions User Manual
Page 27: Energizing procedure, Chapter

27
Publication 1748-IN001B-EN-P - May 2009
Chapter
4
Energizing and Commissioning
This chapter provides you with instructions for energizing the DataSite
configured panel.
Energizing Equipment
This procedure is provided as a general guidance for energizing a newly
installed DataSite configured panel.
Energizing Procedure
1. Review any additional instructions supplied for the proper operation of
special units with appropriate and qualified personnel.
IMPORTANT
Perform this procedure after the Final Check procedure has
been completed. See
Chapter 3, Final Checklist Before
.
ATTENTION
Energizing a DataSite controller for the first time is potentially
dangerous. Serious damage and/or personal injury can result
when the power is turned on. Therefore, only qualified
personnel should energize the equipment.
IMPORTANT
Ensure that there is no load on the DataSite controller when it
is energized. Also, make sure any associated remote devices
are de-energized.