Publication 1748-IN001B-EN-P - May 2009

Final Checklist Before Energizing 25

8. For applications requiring power fuses, install the fuses in the fusible

switches in accordance with the NEC application requirements.
All fuses must be completely inserted in the fuse clips. Fuses may only
be inserted after the location has been determined to be non-hazardous.

9. Component devices may require unique start-up procedures. For

specific start-up guidance, refer to the DataSite Hardware User Manual,
publication

1758-UM001

. Set and verify adjustable current, voltage and

other settings, according to device instructions or wiring diagrams.

10. Manually exercise all switches, including control auxiliary switches,

circuit breakers, their respective operators, and any other operating
mechanisms to verify proper operation.

11. Check timing relay settings as required.

12. Recheck and ensure that all barriers and parts that may have been

removed during installation have been reinstalled.

13. Before closing the enclosure and/or individual units, remove all tools,

metal chips, scrap wire and other debris from the interior of the
DataSite configured panel. If there is an accumulation of dust or dirt,
clean out the DataSite configured panel using a brush, vacuum cleaner
or clean, lint-free rag. Do not use compressed air. Doing so will
redistribute contaminants on other surfaces.

14. Make sure all unit latches are secure.

15. Close and latch all doors, making sure that no wires are pinched.

ATTENTION

When conducting an electrical insulation resistance test,
isolate equipment sensitive to high test voltages, such as
meters, solid state devices, motor winding heaters, and
capacitor units.