Step 1: check environment, Step 2: check solar panel output, Step 3: check condition of batteries – Rockwell Automation 1748 DataSite Configured Panel Installation Instructions User Manual
Page 37
 
Publication 1748-IN001B-EN-P - May 2009
Troubleshooting 37
Step 1: Check environment
Ensure that the environment is clear of all hazards including explosive gases 
before opening the DataSite configured panel. Refer to NFPA 70E, 2004 
Safety Guidelines when servicing the DataSite configured panel equipment.
Step 2: Check solar panel output
Check the solar panel output to ensure that the solar array is connected and 
working properly.
•
Disconnect the solar panel from the DataSite configured panel and 
measure the voltage of the solar panel while sunlight is striking the 
panel. In sunny conditions the open voltage of the solar panel should 
read between 18…24V DC. A lower value could indicate a problem with 
the solar panel array.
Step 3: Check condition of batteries
Check the condition of the batteries.
1. Check the connections for the battery and make sure that all terminals
are torque to their specified ratings and that no wires are cut or frayed.
2. Create a load on the battery by using a battery load tester
(1)
. If the
battery test fails, replace the battery.
If the battery is working properly, move onto
power transistors in solar controller
(1)
Use a battery load tester designed for Lead Acid Batteries. Follow the instructions of the load tester to check 
the condition of the battery.