Restoring a backed- up project – Rockwell Automation 8520-OM Offline Development System User Manual User Manual
Page 60

5--18
Using ODS for Project Management
Publication 8520--UM051A--EN--P -- October 2000
Offline Development Manual (ODS) Software User Manual
5. Insert the floppy disk into the drive then press any key.
!
CAUTION: The
Backup
option lets you save only
one project per floppy disk. At least one floppy per
project is needed to back up more than one project and
some projects may require more than one floppy disk,
depending on the size.
The are files as they are being copied. When the backup is
complete, ODS displays the message:
Backup completed. . .
. . . remove floppy . . .
. . . label floppy disks...
6. Press any key and ODS returns to the top-level menu bar.
!
CAUTION: Although all project files have been
copied from the hard disk to floppy disk, nothing has
been deleted from the hard disk. To delete the backed
up project from the hard disk, use the
Delete Proj
procedure.
If necessary, a project that was backed up and deleted can be restored
from a floppy disk to the hard drive. Use this procedure:
1. Press [
F2
] and pull down the F2-Project menu.
2. Select the
Restore
option.
ODS displays the message
RESTORE Project
and asks which
floppy drive the project will be restored from.
Restoring a Backed- up