Introduction overview, Transportation/installation, Baum 30 baum 26 – Baumfolder BAUM 26_30: Folder 1st Station Contfeed User Manual

Page 10

Advertising
background image

TP10476-1

PAGE 10

INTRODUCTION OVERVIEW

The 1st station (parallel) folder with continuous

feeder contains the following main components (Figure 1):

1.

Continuous Feeder

2.

Register

3.

1st Station Folder (Parallel)

4.

Fold Roller Baumset settings

5.

Fold Plates

6.

Slitter Shafts (not shown)

7.

Delivery (Stacker, not shown)

8.

Operator Controls

9.

Double Sheet Detector (not shown)

10.

Vacuum Pump (not shown)

11.

Handwheel

Figure 2

Figure 1

TRANSPORTATION/INSTALLATION

As soon as you receive your new folder, and before

removing the machine from the skid, check carefully for any
damage to the shipments. If any damage is found, promptly
contact your Baumfolder sales representative.

To lift the folder from the skid, place the fork lift rails

under the crossmembers as shown in Figure 2. Note that the
fork lift must have at least a 1500 lb. capacity.

Remove all rust protection coating after unpacking the

folder.

5

11

8

3

1

149"

68"

46"

265"

54.5"

(3.03m)

119"

77.5"

(1.97m)

(1.38m)

(1.17m)

(1.73m)

(6.73m)

(3.78m)

Remove the connecting bolts from the side frame at the

front of the register. Move the feeder next to the properly
aligned fold head and adjust it so that the holes in the
register and in the side of the folder are at the same height.

Remove the transport supports after you
align the feeder.

Install the drive belts on the folding unit and check

their tension.(Figure 3)

Figure 3

4

2

BAUM 30

BAUM 26

Advertising