Metrohm 820 IC Separation Center User Manual

Page 44

Advertising
background image

2 Installation

819 IC Detector / 820 IC Separation Center

36

1 Open column heating

•

Open the two knurled screws 36 and remove cover 37 of the

column heating.

2 Prepare column heating

•

Unscrew the six screws of holder plate 54 and remove the

holder plate from the column heating.

•

Lead column connection capillary 50 (approx. 1 m PEEK-

Capillary 6.1831.010) through feedthrough 41 in the column

heating and place in the recesses in capillary prewarmer 55

as shown in Fig. 20.

•

Then screw down holder plate 54 again with the six screws.

•

Cut off a further piece of 6.1831.010 PEEK Capillary, lead this

Capillary 52 out through feedthrough 35 and provide its inner

end with a 6.2744.010 Compression fitting 43.

If not much space is available then the

6.2744.070 PEEK compres-

sion fitting short contained in the standard equipment can also be

used for attaching the PEEK capillary.

3 Insert separating column

•

Press separating column 53 into the holding clips and fasten

the column connection capillary 50 to the separating column

inlet (bottom) with a 6.2744.010 Compression fitting 43.

•

Fasten capillary 52 from the detector to the outlet of the

separating column (top) with a 6.2744.010 Compression fit-

ting 43.

4 Close column heating

•

Screw down cover 37 on to the column heating again with

the two knurled screws 36.


Advertising
This manual is related to the following products: