02 preparations for operation, Preparations for operation -2, At the start of each operating session – Tweco CutMaster 12mm-20mm-25mm User Manual

Page 30

Advertising
background image

CUTMASTER 12mm, 20mm, 25mm

OPERATION 4-2 Manual 0-5117

4.02 Preparations for Operation

At the start of each operating session:

WARNING

Disconnect primary power at the source before

assembling or disassembling power supply,

torch parts, or torch and leads assemblies.

Torch Parts Selection

Check the torch for proper assembly and appropri-

ate torch parts. The torch parts must correspond

with the type of operation, and with the amperage

output of this Power Supply (40 amps maximum

for the 12mm, 60 amps maximum for the 20mm,

and 80 amps maximum for the 25mm). Refer to

Section 4T.07 and following for torch parts selec-

tion.

Torch Connection

Check that the torch is properly connected. Only

Thermal Dynamics model SL60 / Manual or SL100

/ Mechanical Torches may be connected to this

Power Supply. See Section 3T of this manual.

Check Primary Input Power Source

1. Check the power source for proper input

voltage. Make sure the input power

source meets the power requirements for

the unit per Section 2, Specifications.

2. Connect the input power cable (or close

the main disconnect switch) to supply

power to the system.

Air Source

Ensure source meets requirements (refer to

Section

2). Check connections and turn air supply ON.

Connect Work Cable

Clamp the work cable to the workpiece or cutting

table. The area must be free from oil, paint and

rust. Connect only to the main part of the work-

piece; do not connect to the part to be cut off.

Art # A-04509

Power ON

Place the Power Supply ON / OFF switch to the

ON (up) position. AC indicator

turns ON.

Gas indicator turns ON if there is sufficient

gas pressure for power supply operation and the

cooling fans turn ON.

NOTE

Minimum pressure for power supply operation

is lower than minimum for torch operation.
The cooling fans will turn ON as soon as the

unit is turned ON. After the unit is idle for

ten (10) minutes the fans will turn OFF. The

fans will come back ON as soon as the torch

switch (Start Signal) is activated or if the unit

is turned OFF, then turned ON again. If an over

temperature condition occurs, the fans will

continue to run while the condition exists and

for a ten (10) minute period once the condition

is cleared.

Set Operating Pressure

1. Place the Power Supply Function Control

knob to the SET

position. Gas will

flow.

2. For Standoff cutting, adjust gas pressure

from 70 - 85 psi / 4.8 - 5.9 bar (LED's

in center of control panel). Refer to the

Standoff chart for pressure setting details.

A

+

PSI

BAR

MAX

MAX

MIN

MIN

!

1

2

Art# A-07946

MIN

MAX

Advertising