05 checking of grounding, Checking of grounding -18, Sc-3000 – Tweco SC-3000 User Manual

Page 40

Advertising
background image

SC-3000

INSTALLATION

3-18

Manual 0-5100

3.05 Checking of Grounding

The following componants must be connected to

machine ground (PE) as described in the instal-

lation instructions to obtain a safe and reliable

operating system

• Control Interface 9-0405
• Linear Drive 9-0404
• Torch Clamp

Advertising