05 checking of grounding, Checking of grounding -18, Sc-3000 – Tweco SC-3000 User Manual
Page 40
Advertising
SC-3000
INSTALLATION
3-18
Manual 0-5100
3.05 Checking of Grounding
The following componants must be connected to
machine ground (PE) as described in the instal-
lation instructions to obtain a safe and reliable
operating system
• Control Interface 9-0405
• Linear Drive 9-0404
• Torch Clamp
Advertising