Appendix 1: definitions, Sc-3000 – Tweco SC-3000 User Manual

Page 71

Advertising
background image

SC-3000

Manual 0-5100

A-1

APPENDIX

APPENDIX 1: DEFINITIONS

THC

Torch Height Control, in this case refers to the SC3000.

Initial Position Start

Input where Start from CNC is applied to start THC’s height finding sequence.

Ready (Start XY)

Input to THC for arc transferred signal from plasma (OK to Move).

Enable Ignition Plasma

Originally intended to start the plasma, now used to start preflow while finding height when that feature is

enabled (Operator Terminal Preflow set to non-zero)

Separate Ignition Plasma

Signal activates Start relay on PCB to supply isolated Start to plasma.

OK to Move-PS(plasma)

Signal from plasma indicating arc transfer has occurred. Is routed directly to the THC and indirectly to CNC

controller via OK to Move relay on PCB .

THC Pierce Delay

Time (parameter set on the operator terminal) following arc transfer that torch remains at pierce or elevated

height.

OK to Move (THC)

Signal from THC, active at end of THC pierce delay.

CNC Pierce Delay

Dwell time after CNC receives OK to Move from THC or Plasma before CNC starts torch horizontal motion.

THC Preflow time

Setting on Operator Terminal (OT) used for preflow during height finding.

THC Control delay

Often called AVC delay, this is time starting when torch is moved to cut height until THC starts controlling

height to the sampled arc voltage.

Advertising