05 signal flow during plasma cutting, 06 sc 3000 operation sequence, Signal flow during plasma cutting -9 – Tweco SC-3000 User Manual
Page 49: Sc 3000 operation sequence -9, Sc-3000

SC-3000
Manual 0-5100
4-9
OPERATION
4.05 SIGNAL FLOW DURING PLASMA CUTTING
From To
Signal
CNC
Initial Pos. Start
Plasma
Separate Ignition
Plasma
CNC
Ok To Move
Delay Time
Control Active
Surface of work piece
Reference Position
Cutting Height
Plasma
Time / Track
Cutting On
Cutting Off
Pierce Height
Elevation Height
Start XY
Retract Position
Corner
1
2
3
4
5
6
State
Clearance
Art # A-08934_AB
SC-3000
SC-3000
SC-3000
SC-3000
SC-3000
SC-3000
SC-3000
SC-3000
OK PS
Plasma
CNC
4.06 SC 3000 Operation Sequence
Definitions:
THC
• Torch Height Control, in this case refers to the SC3000.
Initial Position Start
• Input where Start from CNC is applied to start THC’s height finding sequence.
Ready (Start XY)
• Input to THC for arc transferred signal from plasma (OK to Move).