The preferred method of installing bearing cones is to heat them to
approximately 250°F prior to installation. During this operation protective
gloves should be used. Once bearing cones are installed in correct position
they should be allowed to cool before proceeding with assembly. As an
alternative, bearing cones may be pressed into position providing the proper
equipment is employed and the necessary procedures are used to prevent
component damage.

Under no circumstances should bearing cones or cups be hammered
into position.

For torque settings of fasteners and shaft rolling torque, see section 5.2.

4.1 Disassembly.


4.1.1 Front Cover and Rotor Removal - see Fig 15.

-

Follow recommended Shutdown Procedure, refer to section 3.5.

-

Gradually loosen front cover retaining dome nuts (36). Care should be
taken as there may still be residual product and pressure in the pump
head. As the dome nuts are loosened this will vent to atmosphere.

-

Remove dome nuts (36) .

-

Remove front cover (38), using lever slots where necessary, and the
front cover o-ring (39).

-

Remove rotor retainers (35) using socket (58).

Note: The socket (58) should always be used. The use of other
tools may damage the retainer.

-

Remove retainer o-ring (34).


-

Remove rotors (41) from shafts (items 9 and 10 see fig 5.6 on page
60), taking care not to damage the product seal components.

WARNING