Assembly, Pre-assembly – Wheatheart S2000 Post Pounder User Manual

Page 21

Advertising
background image

W

HEATHEART

- P

OST

P

OUNDER

3. A

SSEMBLY

S2000 M

ODEL

3.1. P

RE

-A

SSEMBLY

IM15 R1

21

3. Assembly

The following procedures and instructions are necessary to ensure proper and
safe assembly of your S2000 Post Pounder.

To assemble the S2000 Post Pounder, perform the following procedures in the
order that they are listed here:

“Pre-Assembly” on page 21
“Assembling the S2000 Post Pounder” on page 22
“Installing the PTO Kit” on page 28 (optional)

3.1. PRE-ASSEMBLY

Upon receiving your shipment:

• Open shipping crates and arrange components on a flat, open workspace.
• Remove bolts on ballast box cover and remove the hardware bag from inside

the ballast box.

• Count components and refer to shipping list to ensure no part is missing.

Contact your dealer or Wheatheart in the event of missing parts.

• Ensure that you have a clear and safe work area, with access to power and

lighting if required.

• Review “General Safety” on page 14.

The following equipment will be needed during assembly:

• a lifting device suitable to support the mast assembly during installation
• safety equipment (e.g. steel toe boots, gloves, goggles)
• vise grips
• mallet
• pry bar
• wrench set (standard/imperial)
• hacksaw or chop saw for cutting hydraulic hose (for PTO Kit only)

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Advertising