3. Secure hugger brackets to the mast assembly with four bolts and locknuts,

but before securing the top-right bolt, place the mast level into place on the
bolt. In order to be roughly accurate, the face of the level should be flush with
the upper edge of the hugger bracket.

4. Secure the front roller plate to the hugger bracket by re-attaching and

tightening the previously removed front roller plate bolts.

5. Ensure that all hugger bracket and front roller plate bolts are tight.

Figure 3.7 Connecting the Hugger Arm Cylinder

6. Position the hugger cylinder so the hydraulic connectors face downward, and

insert the appropriate mid-cylinder mounting tab into the mid-cylinder
bracket, and fasten with a 1/2” x 2-1/4” bolt and locknut.

7. Insert

the

cylinder rod end into the front cylinder bracket (directly on the

hugger arm) and fasten with a 1/2” x 2-1/4” bolt and locknut.

3.2.4. I

NSTALL

H

AMMER

B

ALLAST

1. Remove the two 1/2”x1-1/2” bolts that secure the ballast box cover to the

ballast box, and place the bolts and cover aside (see Figure 3.8).

2. Fill the ballast box with either:

a. pre-weighed ballast of a suitable material (e.g. rebar, slugs, bolts, ball

bearings),

b. or optional “suitcase” ballasts that can be ordered from Wheatheart (Part

Number 2311154). Each ballast weighs 45.4 lbs.

1/2” X 2-1/4 BOLTS

LOCKNUTS

FRONT CYLINDER BRACKET

MID-CYLINDER BRACKET