Frame assembly – Wheatheart S2000 Post Pounder User Manual

Page 7

Advertising
background image

W

HEATHEART

- P

OST

P

OUNDER

1. I

NTRODUCTION

S2000 M

ODEL

1.2. F

RAME

A

SSEMBLY

IM15 R1

7

1.2. FRAME ASSEMBLY

The frame assembly is shipped with all hydraulics pre-connected except the
hydraulic hose that must be connected to the mast cylinder. Figure 1.1 shows the
major frame assembly features.

Figure 1.1 Frame Assembly

PIVOT ARM

HYDRAULIC CONTROLS

(CLASS II /III THREE-POINT HITCH ATTACHMENTS)

PIVOT ARM

(JACK STAND)

LOCK BARS

PTO PUMP SUPPORT

(OPTIONAL)

(CONTROL VALVE)

MAST ASSEMBLY MOUNT

Advertising