Assembly

Assembly items are those that must be completed prior to
first unfolding.

Position for Assembly

1.

Unload drill from truck and place it in a location that
allows for:

• tow away depth:

23 feet (7m) plus
length of tractor plus
turning room

• wing unfolding:

13.5 feet (4.1m) either side of centerline, or
27 feet (8.2m) total span), and

• if markers were ordered:

27 feet (8.2m) either side of centerline, or
54 ft (16.4m) total span.

Install Wing Walkboards and Steps

There are two walkboards, one on the back of each wing
seed box. The walkboards themselves are identical for
each section. The way they install varies by section.

Bolts for walkboards are shipped in a bag in one of the
drill boxes.

If the drill has swing-down ladders, the wing walkboard
installation is identical at the outside ends.

If the drill has single steps, they are mounted as part of
the walkboard installation, and require longer bolts at the
outside ends.

Walkboards with Single Steps

Refer to Figure 3

1.

Select one walkboard

, and four sets of

1

2

x1

1

4

inch

bolts

, lock washers and hex nuts

.

2.

Using the top bolt holes on each end, temporarily bolt
each wing walkboard

to box support channels

.

3.

Skip to Install Fixed Walkboard Steps” on page 11.

Walkboards with Swing-Down Ladders

Refer to Figure 3

1.

Select eight sets of

1

2

x1

1

4

inch bolts

, lock washers

and hex nuts

.

2.

Bolt each wing walkboard

to box support channels

.

Figure 3

Wing Walkboards, Inner End

18810

1

3

4

2

1

3

4

1

2

3

4

1

2

Advertising
This manual is related to the following products: