Pre-Assembly Checklist

1.

Read and understand “Important Safety Informa-
tion
” on page 1 bef
ore assembling.

2.

Have at least two people on hand while assembling.

3.

Make sure the assembly area is level and free of
obstructions (preferably an open concrete area).

Allow room for wing unfolding and any markers (See
Position for Assembly” on page 8).

4.

Have all major components accounted for.

5.

Have all fasteners and pins shipped with implement.

6.

Have a copy of the implement Parts Manual (195-
069P) on hand. If unsure of proper placement or use
of any part or fastener, refer to the parts manual.

7.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

8.

Check that all factory-applied safety labels and
reflectors are correctly located and legible. Replace
if improperly located or damaged. Refer to Safety
Decals
, in the “Important Safety Information” sec-
tion of the implement Operator’s Manual.

Note: Some decals are dealer installed, to prevent decal

damage during disassembled shipment.

9.

Inflate tires to recommended pressure as listed on
the “Tire Inflation Chart” on page 30.

10. Tighten wheel bolts as specified on “Torque Values

Chart” on page 31.

IMPORTANT !

If a pre-assembled part or fastener is temporarily
removed, remember where it goes. Keep the parts
separated.