Great Plains 3P4025AH Operator Manual User Manual

Page 3

Advertising
background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

2014-07-29

Cover

Index

195-325M

©

Copyright 2014 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,

Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................5
Introduction ................................................................12
Description of Unit ........................................................12

Intended Usage ........................................................12

Models Covered ...........................................................12

Document Family......................................................12

Using This Manual........................................................12

Definitions.................................................................12

Owner Assistance ........................................................13

Product Support .......................................................13

Preparation and Setup ...............................................14
Post-Delivery/Seasonal Setup......................................14
Pre-Planting Setup .......................................................14
Hitching Tractor to Planter............................................15

Preset Hitch Spacers and Pin...................................15
First Time Hitch Alignment .......................................15
Hitch Tractor .............................................................15
Hydraulic Hose Hookup............................................16
Protecting Fan Hydraulic Motor Seals ......................16
Electrical Hookup......................................................17
Raise Parking Stands ...............................................18

Leveling the Planter......................................................19

Center Frame L/R Leveling ......................................19
Wing Leveling ...........................................................19
Front-to-Back Leveling .............................................20

Operating Instructions...............................................21
Pre-Start Checklist .......................................................21
Implement Locks ..........................................................22

Wing Lock and Flex Lock Pin Use............................22
Lift-Assist Locks (Option)..........................................23

Raising/Lowering Planter .............................................23

Raise/Lower 3-Point .................................................23
Raise/Lower 2-Point with Lift Assist .........................23

Folding..........................................................................24
Unfolding ......................................................................26
Transporting the Planter...............................................27

Transport Checklist...................................................27

Loading Seed ...............................................................28
Monitor Operation.........................................................30
Air System Operation ...................................................31

Air and Seeding System Overview ...........................32

Fan Circuit Operation ...........................................33
Butterfly Valve ......................................................33

Air-Pro

®

Meter Operation............................................. 34

Meter Operation ....................................................... 34

Field Set-Up Checklists................................................ 35
Field Operation ............................................................ 36
Short-Term Parking...................................................... 37
Long-Term Storage ...................................................... 38
Adjustments ............................................................... 39
Setting Seed Rate ........................................................ 40

Planting Rate Details................................................ 40

1. Rate: Monitor configuration: ............................. 40
2. Rate: Disk Selection: ........................................ 40
3. Rate: Range Sprockets .................................... 40
4. Rate: Transmission Sprockets ......................... 40
5. Rate: Seed Inlet Shutter ................................... 40
6. Rate: Meter Pressurization............................... 40
7. Rate: Checking................................................. 40

Fan and Adjustment ..................................................... 41

Furrow Check: ...................................................... 41

Fine-Tuning Meter Pressurization ............................ 42

Alternate Skip/Double Check ............................... 42

Frame Offset ................................................................ 43

Resume Twin-Row................................................... 43

Gauge Wheel Adjustments .......................................... 44

Gauge Wheel Tension ............................................. 44
Planting on Beds ...................................................... 44
Ground Drive Adjustments ....................................... 44

Hydraulic Down Pressure (Option) .............................. 45

Lift-Assist Needle Valve Adjustment (Option) .......... 46
Initial Down-Pressure Setup..................................... 47
Down-Pressure Adjustment ..................................... 48

Hydraulic Down-Float Adjustments (Option) ................ 49
25AP Series Row Unit Adjustments............................. 50

Row Unit Down Pressure ......................................... 51

Adjusting Down-Force .......................................... 51

Unit-Mount Cleaner Adjustments ............................. 53
Coulter Adjustments................................................. 54

Coulter Depth Adjustment .................................... 54
Coulter Row Alignment ........................................ 55

Row-Unit Opener Disk Adjustments......................... 56

Setting Planting Depth ......................................... 56
Opener Disc Contact Region ............................... 56
Adjusting Disc Contact ......................................... 56

Side Gauge Wheel Adjustment ................................ 57

Adjusting Gauge Wheel Scrapers ........................ 58

Seed Meter Setup and Adjustment .......................... 59

Meter Rain Cover ................................................. 59

Advertising